Production and delivery schedule of industrial custom air coolers and condensers

  • Release time: 2026-09-02

Production and delivery schedule of industrial custom air coolers and condensers

The delivery time of customized refrigeration equipment depends on the modification type, equipment size and industrial standard production load.

The standard manufacturing cycle of the unmodified models of DL,DD,DJ,FNH,FNV and FNVT is 7 to 10 working days. They are semi-finished inventory equipment, and no design adjustment or special molds are needed.

Teams with basic custom modifications have a deadline of 12 to 15 working days. They include the change of voltage, the anti-corrosion treatment of coil and the adjustment of fan speed without changing the main structure.

The customized D series hydrolytic air cooler takes 18 to 22 working days, which is due to the special installation of nozzles, drainage pipes and independent defrosting control system.

FNU sealed capacitors with low-noise customization function can be used within 20 to 25 working days, because they need to be adjusted for the sound insulation shell and individually tested for each unit.

The total duration of large-scale projects with a total of more than 30 units is 28-35 working days, including group quality inspection and export special marine packaging.

According to the operation data of xindacool, 96% of customized orders were completed within the expected time, and there was no logistics delay in international shipping and air transportation.

During the peak season from June to August, due to the strong global demand for refrigeration equipment for agricultural food and logistics projects, the refrigeration time was extended by 30%.

For urgent delivery, rapid production service can shorten the delivery time by 40%, which is suitable for all standard and semi-custom models without profound structural changes.

FAQ
What is the expiration date of DL, DD and FNH standard equipment? The standard model takes 7 to 10 working days to manufacture.
How long is the customized D series water thawing period? They need 18 to 22 working days to complete a specific hydraulic system.
Can express service shorten the time? Yes, the express service has shortened the production time by 40%.
When will the production period be extended? Deadlines increased by 30% during the peak season from June to August.
How reliable is the deadline of xindacool? 96% of the orders were delivered within the time limit stipulated in the contract.

Key words: delivery date, DL series air cooler, DD series air cooler, D series DJ series air cooler, D series hydrolysis, FNH condenser, FNV condenser, FNVT condenser, FNU condenser, customized cooling equipment.

url: https://xindacool.com/news/496.html

Stable quality · Trustworthy

CONTACT US

Address: No. 866, Putian Avenue, Sanjiang Sub-district, Shengzhou City, Zhejiang Province 
Mobile phone: +86 13567599011
Landline: 0575-83268796 
Email:michelle@xindacool.com

Copyright © 2026 Shengzhou Xinda Refrigeration Equipment Factory All Rights Reserved.